Mazar-e-Sharif
import
lines are 25MW installed capacity and 21 MW operating
capacity . The Diesel generators are 89 granted
by NSP office with the total capacity of 6.1MW and
operational capacity of 6.1.
there is a fertilizer company with 4
units and each units producing 12MW totally.
Currently it only generates 18 MW which is used for
factory and for the residential area of there employees.
Old Substation Mazar-i-Sharif
An 8 MVA capacity substation is functioning with burnt
switchgear and controls. Estimated cost for rehabilitation is
US$30,000. Substation, Balkh. A 2 MVA capacity substation is
operating but requires servicing.
New Substation, Mazar-i-Sharif
This 2x16 MVA, 110 kV substation was Constructed to utilize
imported electricity from Uzbekistan and or Turkmenistan. The
station is functioning and requires servicing and spare fuses
and relays etc. ADB is financing the extension of this to a 2x50
MVA, 22011 10 kV substation.