Pul-e-khumri I Hydro electric
plant
This plant using German equipment of capacity 3 x 1.6
. MW, is damaged and the cost for
rehabilitation is estimated at USS 1.8 million. This plant
belongs to the Ministry of Mines and Industry and is operating
at low capacity.

Pulikhumri I Hydroelectric plant. This plant was built on the
Pulikhumri River in 1964by USSR at a cost of USS 3.9 million
with a capacity of 3 x 3 MW using Kaplan type turbines. The
purpose of this plant was to provide power to the towns of
Pulikhumri Baghlan and Kunduz. Only one turbine is currently
operational. The other 2turbinesrequire servicing and spare
parts, especially turbine oil and carbon brushes. Rehabilitation
cost of this plant is about US$ 12 million.
This plant belongs to the Ministry
of Mines and Industry and is operating at low capacity.
Pulikhumri I1 Hydroelectric plant. This plant was built on the
Pulikhumri River in 1964by USSR at a cost of USS 3.9 million
with a capacity of 3 x 3 MW using Kaplan type turbines. The
purpose of this plant was to provide power to the towns of
Pulikhumri Baghlan and Kunduz.

Only one turbine is currently operational. The
other 2 turbines require servicing and spare parts, especially
turbine oil and carbon brushes. Rehabilitation cost of this
plant is about US$ 12 million
Back to pervious page
|