Production and
Dissemination of Wind Pumps in Rural Areas in Herat
Herat is a city known for its 120
days of very strong winds. Even during the remaining part of the
year, good winds are available, though not as strong as during
the 120 days. This leaves a lot of room for utilizing modem
techniques and technologies related to wind energy, in order to
meet the basic needs of the people.
The Wind pumps have been installed
in various villages where they access to the water for drinking
and irrigation purposes a re problematic. These wind pumps are
disseminated on a 40% subsidy basis thus the income is revolved
to produce additional units. In order to implement this
component of the program, the following strategy has been
developed:
1. Requests of the communities
for the wind pumps are received. Requests are considered -based
on priority and need. Prior to installation of a wind pump, the
following activities are undertaken
a. The site is surveyed, in
order to find out if the underground water level is suitable
b.
The
community digs the well, which shall meet the requirements of
the pumps
2. A design is prepared for wind
pumps, which would suit a capacity of 2.5 Liters/second at
a wind
speed of 8 meters/second, by a pumping head of 20 meters, using
a 90 mm crank radius and a
150 mm
piston pump.
3.
A well is dug and a Wind pump, which is produced at the AREA
Wind pump factory, is installed. In addition a reservoir for
storing up to 15 cubic meters of water is constructed.
This
reservoir will make water available for the villagers, at times
when sufficient winds are not
available.
4
.
During the course of the
production site and trained in the construction and
dissemination of the wind pump units. The intention is to enable
them to install and repair these on their
own, thus
multiplying the distribution factor.
|
|
|
|
|
|
|
Wind pump with capacity 2 kilo Watts for drinking water in Anjil district Heart Province (Donor UNOPS, Implementer AREA) |
|
|
|
|
|
|
|
|
|
|
|
|
Inauguration ceremony of first wind pump in Kawbatan village Anjil district Heart province. |
|
|
|
|
|
|
|
|
|
|
|
|
Wind pump with water reservoir (for adopting wind energy) during maintenance.
|
|
|
|
|
|
|
|
|
|
|
|
|
Wind pump during constriction.
|
|
|
|
|
|
|
|
|
|
|
|
|
Fixed shaft alignment of wind pump before installation.
|
|
|
|
|
|
|
|
|
|
|
|
|
Wind pump during installation.
|
|
|
|
|
|
|
|
|
|
|
|
|
Wind pump first day of work.
|
|
|
|
|
|
|
|
|
|
|
|
|
Check of wind pump air blades before installation.
|
|
|
|
|
|
|
|
|
|
|
|
|
Traditional wind mile in Haji Karim village Zendajan district Herat province.
|
|
|
|
|
|
|
|
|
|
|