| S/N |
Title |
Author |
Donor |
Date of Publication |
Links |
| 1 |
Baghdara Hydro Power Project ( preliminary environment and
social impact report ) Main Report |
Fichtner |
Fichtner |
|
Pdf
|
| Baghdara Feasibility Study Volume I |
Fichtner |
Fichtner |
|
Pdf |
| Baghdara Feasibility Study Volume II |
Fichtner |
Fichtner |
|
Pdf |
| Baghdara Feasibility Study Volume III |
Fichtner |
Fichtner |
|
Pdf |
| 2 |
Khanabad Hydro - Electric Project Feasibility Study |
Water & Power Authority |
Afghanistan |
June -76 |
Pdf |
| 3 |
Faizabad Power System Assessment Feasibility Study Mission
Report |
LBG |
USAID |
June -13-2008 |
Pdf |
| Faizabad List of Material BOQ Attachment -1 |
LBG |
USAID |
June -13-2008 |
Xls |
| Faizabad Specification of Equipment Attachment -2 |
LBG |
USAID |
June -13-2008 |
Folder
|
| Faizabad Distribution Standards Attachment -3 |
LBG |
USAID |
June -13-2008 |
Pdf |
| Faizabad SLD of System Auto Cad Attachment -4 |
LBG |
USAID |
June -13-2008 |
|
| Faizabad Site Sketch PDF Attachment -5 |
LBG |
USAID |
June -13-2008 |
|
| Faizabad New Design of Distribution System Auto Cad + Pdf
Attachment -6 |
LBG |
USAID |
June -13-2008 |
Pdf |
| Faizabad Existing Status Due to Old Road Auto Cad + Pdf
Attachment -7 |
LBG |
USAID |
June -13-2008 |
Pdf |
| 4 |
Technical Assistance for Turkmenistan - Afghanistan -
Pakistan Natural Gas Pipeline Project Part One |
ADB |
ADB |
Dec-2002 |
Pdf |
| Technical Assistance for Turkmenistan - Afghanistan Pakistan
Natural Gas Pipeline Project Part Two |
ADB |
ADB |
|
Pdf |
| 5 |
Feasibility study of Development of A Gas Fired Thermal
power Facility in Sheberghan Volume 1 |
AEAI |
USAID |
March-2006 |
Pdf |
| Sheberghan Volume -One Appendices |
AEAI |
|
|
Doc |
| Feasibility study of Development of A Gas Fired Thermal
power Facility in Sheberghan Volume 2 |
AEAI |
USAID |
March-2006 |
Pdf |
| Sheberghan Volume 2 -Two Appendices |
AEAI |
|
|
|
| Feasibility study of Development of A Gas Fired Thermal
power Facility in Sheberghan Volume 3 |
AEAI |
USAID |
March-2006 |
Pdf |
| Sheberghan Volume -Three Appendices |
AEAI |
|
|
Folder |
| Feasibility study of Development of A Gas Fired Thermal
power Facility in Sheberghan Volume 4 |
AEAI |
USAID |
March-2006 |
Pdf |
| Sheberghan Volume -Four Appendices |
AEAI |
|
|
Folder |
| Feasibility study of Development of A Gas Fired Thermal
power Facility in Sheberghan Volume 5 |
AEAI |
USAID |
March-2006 |
Pdf |
| Sheberghan Volume -Five Appendices |
AEAI |
|
|
Folder |
| 6 |
Band-I-Amir Micro Hydropower Project Technical Feasibility
Design Report |
ADB |
|
Jan-2004 |
Pdf |
| 7 |
Feasibility Study of Development of A Gas Fired Thermal
power Facility in Sheberghan |
Maunsell |
USAID |
June-2005 |
Pdf |
| Feasibility Study of Development of A Gas Fired Thermal
power Facility in Sheberghan A-S |
Maunsell |
USAID |
June-2005 |
Pdf |
| 8 |
National Power Transmission Grid |
Fichtner |
ADB |
|
Pdf |
| 9 |
Afghanistan NEPS Transmission System Power
(System Analyze Final Report) |
Siemens |
USAID |
Sep-2007 |
Pdf |
| NEPS Transmission System Appendix A System
Data |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix B
Turkmenistan Option 1 Load Flows |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix C
Turkmenistan Option 2 Load Flows |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix D
Turkmenistan Option 3 Load Flows |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix E
Turkmenistan Option 4 Load Flows |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix F
Turkmenistan Short Circuits Results |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix G
Transient Stability Models |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix H
Transient Stability Results |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix I
Uzbekistan Option 1 Load Flows |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix J
Uzbekistan Option 2 Load Flows |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix K
Uzbekistan Option 3 Load Flows |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix L
Uzbekistan Short Circuits Results |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix M
Tajikistan Option 1 Load Flows |
Siemens |
USAID |
Sep-2007 |
|
| NEPS Transmission System Appendix N
Tajikistan Short Circuits Results |
Siemens |
USAID |
Sep-2007 |
Pdf |
| 10 |
Kajakai Hydro Power Plant Spillway Gats |
IECO |
ADB |
Aug-97 |
Pdf |
| 11 |
TAP Turk-Afg-Pakistan Natural Pipeline Gas Inception |
PENSPEN |
ADB |
|
Pdf |
| 12 |
Yakawlang Micro Hydropower Project A Technical Feasibility ,
Design Report |
ADB |
ADB |
March-2004 |
Pdf |
| 13 |
Sarobi-2, Chain Of Hydro Power Stations on Kabul
river Album- I (Drawings) |
ALL-UD,S & I |
USSR |
1988 |
Pdf |
| Sarobi -1 Chain of Hydro Power Station on
Kabul River Album-II (Drawings) |
ALL-UD,S & I |
USSR |
1988 |
Pdf |
| Sarobi-2 Chain of Hydro Power Station on
Kabul River Album --IV ( Drawing ) |
ALL-UD,S & I |
USSR |
1988 |
Pdf |
| Sarobi-2 Chain of Hydro Power Station
Volume II |
ALL-UD,S & I |
USSR |
1988 |
Pdf |
| Sarobi-2 Chain of Hydro Power Station
Volume IV |
ALL-UD,S & I |
USSR |
1988 |
Pdf |
| Sarobi-2 Chain of Hydro Power Station
Volume V |
ALL-UD,S & I |
USSR |
1988 |
Pdf |
| Sarobi-2 Chain of Hydro Power Station
Volume VI |
ALL-UD,S & I |
USSR |
1988 |
Pdf |
| Sarobi-2 Chain of Hydro Power Station
Volume VII |
ALL-UD,S & I |
USSR |
1988 |
Pdf |
| 14 |
Analysis of the Kabul Distribution System
Final Draft Report |
Siemens |
USAID |
Dec-2007 |
Pdf |
| Appendix A- Case _07_B2 |
Siemens |
USAID |
Dec-2007 |
Pdf |
| Appendix B - Case_07_B1 |
Siemens |
USAID |
Dec-2007 |
Pdf |
| Appendix C - Load Flow &Term Investments
Short Term |
Siemens |
USAID |
Dec-2007 |
Pdf |
| Appendix D- Load Flow & Term Investments
Medium Term |
Siemens |
USAID |
Dec-2007 |
Pdf |
| Appendix E Turkmenistan Option |
Siemens |
USAID |
Dec-2007 |
Pdf |
| Appendix F-Uzbekistan |
Siemens |
USAID |
Dec-2007 |
Pdf |
| Appendix G- Tajikistan |
Siemens |
USAID |
Dec-2007 |
Pdf |
| Appendix H- Cost of Medium Term
Investments |
Siemens |
USAID |
Dec-2007 |
Pdf |
| Appendix I Short Term Investments |
Siemens |
USAID |
Dec-2007 |
Pdf |
| 15 |
NEPS Reactive Power Compensation (Power Grid) |
Power Grid Corporation |
India |
|
Pdf |
| 16 |
Chamkani hydropower - Afghanistan Rebuilding - Institution
Environment |
|
|
|
Pdf |
| 17 |
Lower Kokcha Irrigation and Hydropower Project |
Fichtner |
WB |
May-06 |
Pdf |
| 18 |
Gulbahar Storage Dam Project |
Mohab Ghodss |
WB |
|
Pdf |
| 19 |
Gulbahar Storage Dam Project Including First Stage
Environmental and Social Impact Assessment |
Yekom |
WB |
|
Coming Soon |
| 20 |
Techno-Economic CASA-1000 Transmission Interconnection |
SNC.Lavalin |
ADB |
July-08 |
Pdf |
| 21 |
Afg-Uzb-Taj Transmission Interconnection |
Maunsell |
Maunsell |
Dec-2004 |
Pdf |
| 22 |
Siemens Reactive Power Compensation Study for LBG and B & V |
Siemens |
USAID |
|
Pdf |
| 23 |
SEMEC Kabul System Study Emergency Power Rehabilitation
Project |
SMEC |
WB |
Nov-2006 |
Pdf |
| 24 |
Chakhansur Flood Control and Irregation Project Afghanistan
Volume 1 Report |
IECO |
ADB |
July-1973 |
Pdf |
| 25 |
Kajakai Power Project Kajakai Hydro Electric Power Station
Feasibility Report for the for Kajakai Hydro Electric Power
Station |
|
|
|
Pdf |
| 26 |
Helmand Arghandab Valley Project Afghanistan Central
Arghandab Valley Feasibility Report |
Ministry of Planning |
USAID |
Dec-1970 |
|